Copper cutting & bending Machine for copper bus bars
Test Equipment for testing of LV switchgears (Meggar, insulation & pressure TEst and Control Cable Connection Testing)
Storage facilities for Electrical and Mechanical Inventory items
High Degree of Operator Safety.
Operation not affected by environmental conditions.
Complete erection of substation equipment according to KE/ WAPDA standards which includes installation of LT Poles, Stringing of overhead conductors, laying of HT and LT cables.
Data communication networking solutions.
Installation, monitoring and reporting for complete electrical energy system analyzer.
Energy management solutions.
Feature Text Installation of PLC controlled panels.
Installation & commissioning of variable frequency drives (Inverters).
Pre-detective measurements of upcoming maintenance requirements
Building management system
Bus risers Installations
Installation of temperature Control System for factory automation
We have over 1,200 employees who we view as our most valuable asset.
At FK Engineering, we specialize in a broad spectrum of services, including sustainable infrastructure development, advanced manufacturing and water management solutions