Testing and Diagnosis

  • Inspection of the electrical system components
  • True RMS Voltage and Current Testing
  • Instantaneous Harmonics Distortion Testing
  • Power Factor Testing
  • Voltage Drop (Contacts)
  • Phase Balance Testing
  • Energy Analysis Services and Reports

CABLES (LV, MV & HV)

Pre-Installation Tests

Check for physical damage, manufacturer tags, etc.

Using a megger, usually at 500V/1000V for LV, 5kV for MV.

Verify conductor continuity and phase identification.

DC resistance to ensure proper conductor size.

Post-Installation / Commissioning Tests

LV Cables: Typically, 2U₀ for 5 minutes. MV/HV Cables: Done with AC (VLF) or DC methods.

for MV cables

for HV cables

for cables with metallic sheaths

for HV/MV cables

We have over 1,200 employees who we view as our most valuable asset.

We build Only Big things

We Have 6400+ Premium Clients Nationwide

Asset 2

At FK Engineering, we specialize in a broad spectrum of services, including sustainable infrastructure development, advanced manufacturing and water management solutions

© Copyright 2025 All rights reserved. Designed & Developed By BBDM

Thank You!

Celebrating 53 Years!